TOUGH JOBS DEMAND POWER!

WIND POWER PLANT – ISTANBUL / SILIVRI

  • Home
  • Projeler
  • WIND POWER PLANT – ISTANBUL / SILIVRI
Customer:Istanbul Metropolitan Municipality
Start:20 March, 2024
Completion:30 March, 2024

At Aydıntaş Vinç İşleri A.Ş., we have added another successful operation to our work in the energy sector. Using our modern equipment and expert team, we successfully completed the blade replacement of a wind turbine in Çantaköy, Silivri.

The project was carried out with our Liebherr LTM 1400-7.1 mobile crane, which has a lifting capacity of 400 tonnes. Its extensive reach and outstanding lifting capability enabled the blade replacement to be completed smoothly while maintaining the highest safety standards.